Report Date: 2026-11-12 | Sector View: Cautiously Bullish (12 months) | Coverage: Cold Plates, CDUs, System Integration
Abstract: Per-chip TDP for AI chips has risen from 700W on the H100 to approximately 2,300W on the Rubin generation, and rack power density has climbed from 8-15kW for general-purpose computing to 132-155kW for NVL72, evolving toward approximately 600kW for the Kyber generation — systematically exceeding the economic limit of air cooling at roughly 50-70kW per rack. Liquid cooling has shifted from an "optional efficiency upgrade" to a "functional necessity for AI deployment." AI chip-basis liquid cooling penetration is approximately 10% in 2024 → 33% in 2025 → 53% in 2026E → ~60% in 2027E (TrendForce); global liquid cooling manufacturer revenue approximately USD 1.5 billion in 2024 → approximately USD 3 billion in 2025 → approximately USD 4.6 billion in 2027E (Dell'Oro basis). But a booming market ≠ profits for everyone: profits are highly stratified, concentrated in NVIDIA-certified capacity (CDU gross margins of 40-60%; Taiwanese certified cold plate net margins of 11-20%) and in "power + cooling + services" system platforms (Vertiv net margin of 17.7%); domestic integrated-procurement integration segments are growing revenue without growing profits (leading players' net margins of 3-8%, two companies posting negative net profit growth in 2026). Meanwhile, A-share liquid cooling names trade at 53-137x PE, with the sector index PE at the 96th percentile since 2014 — allocation must be segment-selective: prioritize overseas certified supply chains and system platforms; domestically, only Envicool holds the unique positioning of an "overseas certification" option.
The subject of this report is data center liquid cooling systems, covering three segments: cold plates (direct-to-chip cold plates, primarily copper microchannel skived/etched processes, including in-rack manifolds), CDUs (coolant distribution units, in three tiers: in-rack 250-450kW / row-level 1.5-2.5MW / facility-level 10-14MW), and system integration (secondary-loop design, piping, primary-side interface, full-rack/data-hall delivery and commissioning). Architecturally, single-phase direct-to-chip liquid cooling (DLC) is the absolute mainstream — all current mainstream AI racks (GB200/GB300/VR200 NVL platforms, MI355X) standardize on D2C cold plates, while immersion cooling is constrained by signal integrity, PFAS regulation, and hotspot heat flux density, with no substantive substitution through 2025-2027; it is a complementary architecture (ESI supply chain research).
One-sentence industry chain map: Upstream components (copper materials, brazed plate heat exchangers (BPHE), pumps, quick disconnects (UQD), coolants) → midstream cold plate + CDU + manifold manufacturing (Taiwanese/American certified supply chains + mainland Chinese manufacturers) → system integration and delivery (Vertiv/Schneider/Delta/Envicool, etc.) → downstream ODMs (Foxconn/Quanta/Wistron) and cloud providers/telecom operators/AI computing centers.
Division of labor with companion reports: The three components — pumps, quick disconnects (UQD), and coolants — fall under a companion upstream report (earlier draft) and are not covered in depth here; they appear only as citations in BOM cost structure, supply bottlenecks (UQD top four ~84%, BPHE top four ~75% oligopoly structure), and profit pool comparisons. This industry is organized under a general value-chain framework; for a few specialized metrics (penetration of liquid cooling across all servers globally, precise CDU segment shares), public data is limited and marked "not obtained" where relevant.
Volume drivers form a fully quantified chain: per-chip TDP H100 700W (NVIDIA official) → B200 1,000W (TrendForce) → GB300 approximately 1,400W (GTC 2025) → Rubin approximately 2,300W (Tom's Hardware 2026-01); rack density general-purpose 8-15kW → GB200/GB300 NVL72 approximately 132-155kW (Lenovo official 135kW TDP/155kW max) → Vera Rubin NVL144 approximately 250kW → Kyber racks (Rubin Ultra) approximately 600kW (2027H2, DCD citing GTC 2025). The engineering/economic limit of air cooling is approximately 50-70kW per rack (Uptime Institute: >50kW usually requires liquid cooling; ASHRAE states high-density air cooling has reached its practical limit) — from NVL72 onward (approximately 140kW), full liquid cooling with no fans is the only viable thermal path; the threshold at which liquid cooling shifts from optional to mandatory has been crossed. Capital side: combined capex of the four major North American cloud providers of approximately USD 410 billion in 2025 → approximately USD 725 billion guided for 2026 (+77%, per CNBC and other aggregations).
Price drivers: per-rack liquid cooling value rises with platform generations — GB200 NVL72 approximately USD 41,600/rack → GB300 approximately USD 49,900/rack (+20%, approximately USD 369/kW, Morgan Stanley teardown, cross-verified by Tom's Hardware) → VR200 approximately USD 55,700/rack (+11.7%); from Rubin onward, full liquid cooling with no fans extends the cooling surface from GPU/CPU to CX9 NICs, liquid-cooled busbars (5,000A), and optical modules, structurally raising per-rack BOM content.
Penetration drivers: AI chip basis 2024 approximately 10% → 2025 33% → 2026E 53% → 2027E approximately 60% (TrendForce 2026-08 primary source); cross-check basis — Goldman Sachs AI server basis 2024 15% → 2025 54% → 2026E 76%. Caveat: TrendForce's penetration figures, the MS teardown, and Dell'Oro's aggregate all anchor, to varying degrees, to the same NVIDIA platform roadmap — a highly correlated evidence cluster rather than fully independent verification; a single platform delay would simultaneously undermine multiple layers of assumptions. This chapter's conclusions should be read as "quantified, but strongly correlated with the NVIDIA roadmap."
Headline basis adopts Dell'Oro (manufacturer revenue; first-tier research firm, clear methodology): Global data center liquid cooling market approximately USD 1.5 billion in 2024 → nearly USD 3 billion in 2025 (roughly doubling) → approximately USD 7 billion in 2029 (2025-2029 CAGR 23.6%), with 2026E USD 3.7 billion, 2027E USD 4.6 billion, and 2028E USD 5.7 billion derived via geometric interpolation from its press releases (interpolation method noted; not Dell'Oro's own year-by-year forecast). Two basis risks are disclosed as follows: ① Dell'Oro's 2025-08 report gave a 2024 DLC base of USD 1.1 billion, differing by approximately 36% from its later basis; ② a bottom-up check of NVL rack count × per-rack value yields 2027E of 64,000 racks × USD 55,700 ≈ USD 3.56 billion, already 77% of the USD 4.6 billion total, leaving residual room of only approximately USD 1 billion (below the 2024 base) — implying either the interpolated basis is systematically conservative, or the rack count/per-rack value assumptions are too high; one of the two must hold. This report treats the bottom-up bridge as an upside scenario.
Broad-basis cross-references (not mixed with the headline): Soochow Securities (broad basis including server-side cooling) approximately USD 13.8 billion globally in 2026, approximately USD 21.7 billion in 2027 (+56.9%); Mordor (aggregator basis, including services, unverified) USD 6.77 billion in 2026. The three differ substantially in absolute value but align in growth direction. China market: CAICT basis, AI computing center liquid cooling market RMB 18.4 billion in 2024 (+66.1%) → approximately RMB 130 billion in 2029E (CAGR approximately 47.9%); IDC liquid-cooled servers (complete-system basis) USD 2.37 billion in 2024 (+67%) → 2025E USD 3.39 billion, with 2026H1 revenue +153% YoY.
Base year 2025 approximately USD 3 billion (internally consistent with the Dell'Oro anchor: NVIDIA NVL racks approximately 21,300 × approximately USD 45,000 ≈ USD 0.96 billion + ASIC/TPU liquid-cooled racks approximately 26,000 × USD 32,000 ≈ USD 0.83 billion + HGX air-liquid hybrid/China market/secondary-loop piping etc. approximately USD 1.2 billion to balance) → 2027E approximately USD 5.9 billion: NVL rack ramp-up +USD 2.56 billion (rack count 21,300 → 64,000, back-calculated from TrendForce NVL72 revenue basis; per-rack value USD 45,000 → 55,000), ASIC/TPU racks +USD 0.29 billion (Google AI server liquid cooling share already exceeds 80%; TPU racks fully liquid-cooled; rack count is a derived assumption), other adjacencies +USD 0.10 billion, net increase +USD 2.95 billion. The 2026 bridge value of USD 4.14 billion (+38.5%) deviates +11.8% from the Dell'Oro interpolation (cross-validation passed); the 2027 value of USD 5.94 billion (+43.5%) deviates +29.6%, exceeding the threshold — treated as an upside scenario rather than the base case (part of the gap may stem from double-counting versus the Dell'Oro basis, not yet fully separable).
Inflection verdict: quantified — driver variables (NVL shipments 21,300 → 64,000 racks; capex +77%) × unit consumption (per-rack value USD 41,600 → 49,900 → 55,700) × penetration (10% → 60%): all three layers have primary-source figures; the risk lies in timing, not direction.
Order-placing parties, in order: the five major North American CSPs (approximately 70% of NVL rack purchases, falling to 60% in 2026E), Google (in-house TPU route, AI server liquid cooling share >80%, USD 44 billion Anthropic lease guarantee tied to TPU shipments), new clouds like CoreWeave/xAI and sovereign AI (share rising to 40%), Chinese internet companies and telecom operators (Alibaba ≥RMB 380 billion AI/cloud investment over 3 years; the three major operators' liquid-cooled 10K-GPU clusters entering service — the latter's 50% liquid cooling target is an aspirational statement in a 2023 white paper, not a binding metric, and operator capex is declining overall; treat as a background variable, not a primary anchor). Critical funding-quality risk to flag: hyperscaler capex growth has exceeded internal cash flow generation, with financing structures shifting to leases/JVs/project debt (Brookings 2026-09); the +77% 2026 guidance includes substantial committed funds. If growth decelerates to +30-40% in 2027, the NVL rack count assumption would need a 20-30% downgrade — this is the single largest demand risk within 12 months and is already embedded in scenario probabilities (see I7).
Cold plates: Taiwanese players dominate the NVIDIA chain — AVC cold plate monthly capacity approximately 1 million units + approximately 7,000 rack manifolds/month (disclosed 2026-09; liquid cooling module capacity expanding from approximately 200K to approximately 1M units/month within 2026, ahead of the market's previous 2027 expectation); Auras Thailand's complete cold plate capacity 100K → 200K sets/month (Phase II mass production 2026Q1) + approximately 90K sets/month in Guangzhou; CoolerMaster raising total Vietnam investment to approximately USD 3 billion, with components in mass production 2026Q4. CDUs: Tier-1 landscape shows a "six-pole" structure (Vertiv, Eaton/Boyd, Schneider/Motivair, nVent, Modine, CoolIT/Ecolab), with unit capacity now at 2.3-2.5MW and modular skids reaching 14MW. Mainland Chinese players (Envicool/Shenling/Highly/Sunfly) mainly serve domestic AI computing and the Huawei chain; in 2026-02 Envicool became the only mainland NVIDIA NPN Tier1 liquid cooling supplier. Currently certified production lines are generally running at full utilization on two shifts, with CDU orders scheduled through year-end.
In the GB200 era, NVIDIA designated cold plate loop suppliers; from GB300 onward, NVIDIA shifted to a "design reference + interface specifications + qualified supplier list (RVL/DSX Ready)" model, delegating procurement decisions to ODMs — certification moved from "sole-supplier" to "list-based"; firms on the list enjoy orders and premium pricing, while off-list nominal capacity, however large, cannot enter the main loop. List-entry cycles run approximately 12-18 months (industry survey basis, unverified); upstream precision lines (BPHE vacuum brazing, UQD precision machining) require 18-30 months of certification (ESI). In 2026-09, NVIDIA's first batch of DSX Ready CDU certifications went to only three firms: Vertiv, LG, and LiquidStack; Google's ASIC chain uses a direct-procurement model, and its fifth-generation CDU supplier list already includes Envicool — mainland players moving from off-list to on-list is the line of greatest marginal change.
Cold plates: predominantly copper microchannel, with copper at approximately 40-50% of BOM (industry consensus estimate, unverified); SHFE copper at approximately RMB 108,000/ton as of 2026-11 in a backwardation structure; a +10% copper price → cold plate costs approximately +4-5%; gross margins 25-30%. CDUs: plate heat exchangers (BPHE, top four >75% share) are the largest component; pump assemblies/quick disconnects fall under the companion report and are listed here only as cost items; gross margins 40-60%, the highest tier among the four core components (Dongguan Securities). GB300 NVL72 per-rack liquid cooling component value approximately USD 97,500 (Soochow broad-basis split: cold plates 41%/CDU 32%/quick disconnects 14%/manifold 13%) — note this basis (all components) differs from the MS in-rack cooling content basis (USD 49,900/rack); this report does not mix them. Taiwanese and leading mainland players' reported gross margins are close (Auras 3Q26 25.7% vs Highly 9M26 29.6%); the substantive difference lies in certification and customer structure: Taiwanese players are embedded in the ODM ecosystem + Southeast Asian capacity to avoid tariffs, exclusively capturing NVIDIA chain ramp; mainland players face dual constraints of certification and tariffs, with realization mainly in the domestic market.
Bottlenecks intensify moving upstream: CDU wet FAT test benches (approximately 750 racks tested per bench annually), BPHE vacuum brazing furnaces, multi-stage shielded pumps; on the cold plate side, microchannel precision machining + leak testing + cleanroom assembly. Pure assembly capacity can be replicated in 6-9 months and releases fastest. Relief timeline judgment (accounting for Taiwanese expansion already realized ahead of schedule): the cold plate segment loosens gradually from 2026Q4, with clear easing within 2027 (AVC Vietnam equipment in 2027Q2/production in Q3 for another +50%; Auras doubling already implemented) — uncertified assembly capacity will most likely enter price wars first in 2027; CDU units loosen around end-2027 to 2028H1 as Vertiv +40-50% and nVent/Motivair expansions come online, but ODM-embedded CDUs (Supermicro has bundled 1.8MW in-row CDU shipments; Delta is launching 140-200kW in-rack CDUs) are eroding third-party CDU premium duration from the other direction; BPHE/UQD (companion report scope) remain tight until 2028 and cap the supply elasticity of the entire chain.
Cold plates: GB300 small cold plates (one per chip) → VR200 microchannel cold plates with MLCP + gold-plated lids + 45°C warm-water design (Auras has tooled prototypes, ramping gradually in 2027); materials evolving from copper-aluminum to composite. CDUs: in-rack 250-450kW → row-level 1.5-2.5MW (Vertiv CoolChip 2300 is the first NVIDIA DSX Ready 2.3MW-class unit) → facility-level 10-14MW modular; the 800VDC high-voltage DC architecture raises the value of high-power shielded pumps. Immersion: constrained, no substantive substitution; Sugon DataCraft's immersion phase-change is confined to domestic HPC/AI computing niches, complementary to cold plates.
Three-tier pricing: cold plates per unit/tray/rack (GB300 high-performance cold plates are the single most expensive item; switch tray liquid cooling approximately USD 1,020/tray); CDUs per $/kW or per unit (in-rack 250kW CDU actual transaction approximately USD 32,000 ≈ USD 128/kW, small-batch order 2026-08; CDU share in full-loop BOM approximately USD 468-515/kW, ESI 100MW model); system integration per $/MW — full-loop IT hardware capex for 100MW: GB200 approximately USD 1.6M → GB300 approximately USD 1.75M → VR approximately USD 1.77M per MW (+9.4%/+1.1%), with density gains diluting unit costs and data-hall-side components filling in. Domestic bid prices approximately RMB 5,000-6,000/kW (approximately USD 700-850/kW, Guosen Securities 2026-07 basis), significantly below overseas certified prices — the same capability's price gap between domestic and international is the certification premium.
Base-case path (next 4 quarters): Market size (Dell'Oro basis interpolated) 2026Q4 approximately USD 1.04 billion → 2027Q1 approximately USD 0.97 billion → Q2 approximately USD 1.06 billion → Q3 approximately USD 1.20 billion → Q4 approximately USD 1.38 billion (2027 four-quarter total approximately USD 4.6 billion); per-rack value GB300 approximately USD 49,900 → VR mixed-period USD 51,000-56,000. Pricing framework = certified capacity × lead time (pricing power in tight segments: CDU lead times 20-44 weeks, orders scheduled through year-end) + platform-generation per-rack value uplift (+12~20% per generation) + order backlog positioning (Vertiv backlog USD 15 billion; nVent approximately USD 2.5 billion on hand).
Upside forces: generational value uplift +20% (GB300) → +11.7% (VR, dual-sourced from MS/Tom's Hardware); expanded cooling surface area (NIC/busbar/optical modules). Deflation forces: ① UBS estimates NVIDIA standardization could cut GPU/CPU cold plate unit prices by ~50% (after offsetting by newly added liquid cooling area, VR200 total per-rack cold plate value is only ~-1% vs GB300, per UBS methodology); ② density effect — cooling $/kW per rack falls from ~369 (GB300) to ~223 $/kW (VR), a 40% decline; ③ from GB300 onward, NVIDIA shifts to an open ecosystem, opening the window for second-source bidding; ④ Taiwan capacity +50-100% and Vertiv +40-50% capacity expansions concentrated in 2027. Net direction after hedging: 2026-2027 industry revenue = volume (NVL racks doubling, then +50%) × price (per-rack +12~20%), both rising, with mild unit $/kW deflation (~10-15% annually, limited to non-certified replicable components); certified scarce components (complete CDU units, upstream BPHE/UQD) retain pricing power through 2026-2027H1; the true deflation inflection point arrives in 2027H2-2028. Methodological risks must be disclosed side by side: VR200 per-rack value has two estimates — $55.7k (MS + Tom's Hardware, this report's baseline) and ~$121k (expert call estimate, unverified firsthand, and with internally contradictory growth annotations). If the latter is confirmed by actual BOM teardowns, cold plate/CDU revenue elasticity would be revised up twofold — this divergence has been listed as adjudication point D2 under Core Controversy I7.
The industry is currently in the mid-stage of a tight cycle: lead times at historical highs but not deteriorating to extreme levels, no accident-type near-term demand cuts, and rising orders and revenue in both volume and price. Profit stratification = a function of certification barriers: CDU/upstream oligopoly components (40-60% gross margin) > certified cold plates (25-30%) > non-certified assembly and domestic integration (3-8% net margin). 2026 is the industry-wide sweet spot of "stable prices, rising volume"; in 2027 the cold plate segment enters "rising volume, slowing price" first, with profit quality concentrating further into CDUs and upstream.
NVIDIA-chain cold plate module CR3 is ~92% and CR5 ~98% (Lingge 1+1, 2026-04: CoolerMaster 54%/AVC 23%/Jentech ~15%/Delta ~6%) — note this differs from the KGI/ESI estimate of ">70% AVC share in the early GB200 generation" as different time-point methodologies; the landscape has been rapidly redistributed since NVIDIA opened up at GB300. On the CDU side: six Tier-1 players plus 15+ entrants, with over $16 billion in M&A during 2025-2026 (Eaton acquiring Boyd Thermal for $9.55bn, Ecolab acquiring CoolIT for $4.75bn, Schneider acquiring 75% of Motivair) accelerating consolidation toward "power + cooling" platform giants. In China: Envicool ranks No. 1 in the 2024 liquid-cooling CDU market (Soochow Securities methodology); Sugon DataEnergy holds 56.8% share in liquid-cooling equipment (CCID methodology — different statistical scopes, listed side by side for reference); on Omdia's global data center thermal management landscape ($7.67bn in 2023), Vertiv ranks top three with share rising +6pct annually.
① Customer certification (highest): NVIDIA RVL/DSX Ready lists and Google-designated supplier lists take 1-2 years; GB200-generation CDU certification was once exclusive to Vertiv; ② Engineering and mass production: cold plate vacuum brazing/microchannel processes plus Southeast Asia ramp-up; megawatt-class CDUs and HVDC architectures have few competitors; ③ Delivery and service networks: North American CSPs demand 26-week-class delivery, forcing overseas plant construction; ④ Capital: Eaton/Ecolab acquisition valuations (22.5x EBITDA / 8.6x EV-Sales) show top assets have become so expensive only giants can buy them. Upstream certification barriers for quick connectors/coolants are even higher — covered in the companion report.
Profits currently sit in two places: ① System-level full-chain platforms — Vertiv FY2025 revenue of $10.23bn and net profit of $1.33bn; 3Q26 revenue +61%, net margin 17.7%, adjusted operating margin 25.2% (+290bps); bundled power + cooling + services and customer prepayments ($4.1bn at 3Q26) constitute full-stack pricing power — note this is company-wide; its liquid cooling segment margin is below the average; ② Taiwan cold plate makers in the certification window — AVC 3Q26 gross margin 33.9%/net margin 19.6% (including non-liquid-cooling businesses such as VC/heat pipes), Auras 25.7%/11.0% — a window dividend of certification scarcity plus supply-constrained capacity. Domestic integration captures the thinnest profits: the five companies Envicool/Shenling/Sugon DataEnergy/Golian/Tongfei combined for ~RMB 1.05bn in 2025 net profit attributable to shareholders (roughly 1/9 of Vertiv alone), with net margins of 3-8%; in 9M2026 Envicool's revenue rose +22.9% while net profit fell -7.6% (net margin ~7.5%, Q3 alone turned positive at +0.25%, mainly due to expense timing and revenue recognition lags rather than price collapse); Shenling's revenue rose +36.9% with net profit -5.4% (operating cash flow -RMB 1.02bn, clear expansion funded by working capital). On a like-for-like adjusted basis, the net margin gap between the overseas certified chain and domestic integration is roughly 5-10 percentage points — direction confirmed, magnitude narrower than headline figures suggest.
Three migration lines over the next 2-3 years: ① Dilution of certification premiums — CDUs shift from Vertiv exclusivity to multi-vendor certification, and decoupled delivery advances, partially transferring excess profits from incumbents to newly certified players (Envicool has entered Google's fifth-generation CDU list), while value concentrates toward higher-technology segments (VR-generation power 1.8-3.6kW/chip; MLCP microchannel cold plates deployed as early as 4Q26 on overclocked VR200; the 800VDC architecture raises the value of shielded pumps); ② ODM/CSP in-house production squeezing independent suppliers — Google's designated-component model, Foxconn's upward integration into modules, and SMCI embedding 1.8MW CDUs into complete racks compress pure processing and third-party CDU segments; ③ M&A consolidation channels profits toward platform giants, narrowing the window for independent assets.
Versus downstream (weak): demand is highly concentrated in the NVIDIA certification system + four major North American CSPs + Taiwan ODMs; UBS estimates standardization could halve cold plate prices; domestic centralized-procurement bidding has already demonstrably eroded margins (top players growing revenue without profit). Versus upstream (medium-to-weak): LME copper +27% over one year (2026-11); cold plate makers have limited pass-through ability (partially reflected in Auras' gross margin falling 29.7% at 1Q26 → 25.7% at 3Q26); BPHE/UQD oligopolies (covered in a separate report) squeeze the midstream in reverse. Profit allocation conclusion: roughly half of this segment's boom dividend is eaten by downstream (NVIDIA/ODMs via standardization and second-sourcing) and upstream (oligopoly components); midstream retention depends on certification status.
| Player | Segment Position | Standing/Share | Key Financials | One-Line Take |
|---|---|---|---|---|
| Vertiv | Full-chain integration: CDU + cold plate + power | Global thermal management top three; exclusive GB200-generation CDU certification | 3Q26 revenue +61%, net margin 17.7%, backlog $15bn; PE(TTM) ~46x, -18% YTD | The largest profit captor of the liquid-cooling era; certification opening and decoupling are its biggest marginal threat |
| Delta 2308.TW | Sidecar CDU + AI power | Sidecar CDU leader; designated supplier for Google's fifth-generation CDU | 3Q26 revenue NT$197.06bn (+31%), gross margin 34.1% | The most squeeze-resistant Taiwan platform via power + cooling synergy |
| AVC 3017.TW | Certified cold plate leader | ~23% of NVIDIA-chain cold plates (Lingge); once >70% in early GB200 (KGI) | 3Q26 revenue NT$59.09bn (+52%), net margin 19.6%; PE 30.7x at a one-year low | The fattest single-segment profit of this cycle; beware mean reversion from certification expansion and annual price cuts |
| Auras 3324.TW | Taiwan cold plate second tier | One of the four major cold plate suppliers | 3Q26 revenue +64%, gross margin 25.7% (29.7% at 1Q26); PE 26.3x | A leading indicator of cold plate margin mean reversion |
| Boyd/Eaton | US cold plate + CDU | 5 million cold plates cumulatively delivered | 2026E revenue ~$1.7bn (~$1.5bn liquid cooling); $9.55bn deal = 22.5x EBITDA | Independent US asset absorbed into a power giant; profit platformization |
| CoolIT/Ecolab | D2C cold plate full solutions | Omdia No. 1 in D2C (2023-24) | NTM revenue ~$550m; $4.75bn deal ≈ 8.6x EV/Sales | Top cold plate asset acquired at a premium, validating the "picks-and-shovels" pricing power |
| nVent | CDU + liquid cooling infrastructure | North America second tier | 3Q26 +44%, data center backlog ~$2.5bn; FY25 net margin 18.2% | A steady profit sharer with three expansions in three years |
| Schneider/Motivair | Megawatt-class CDU | MCDU-70 single unit 2.5MW | $850m for 75% controlling stake, tripling output | The textbook move of a giant buying its liquid-cooling ticket |
| Envicool 002837.SZ | Domestic full chain (cold plate + CDU + integration) | Domestic liquid-cooling CDU No. 1; mainland's only NPN Tier1; Google custom CDU | 9M26 revenue +22.9%, net margin ~7.5% (Q3 turned positive); PE(TTM) ~107x | Domestic leader + overseas certification option; valuation is stretched and needs time to digest |
| Sugon DataEnergy | Immersion phase-change + cold plate | 56.8% domestic share in liquid-cooling equipment (CCID) | FY25 revenue +74%, ex-non-recurring net margin ~3.8% | Immersion differentiation + domestic compute positioning; thin profit pool, high quarterly volatility |
| Shenling Environment 301018.SZ | Domestic thermal control integration (Huawei chain) | Core thermal control supplier to the Huawei chain | 9M26 revenue +36.9%/net profit -5.4%, operating cash flow -RMB 1.02bn; PE 121x | A textbook case of "revenue first, profit last, cash flow funding expansion" |
| Golian 300499.SZ | Immersion/CDU differentiation | Not available | 9M26 revenue +30.5%/net profit +76.8%, gross margin 29.6%; PE 137x | A small-cap improvement option; order visibility weaker than leaders |
Return quality stratification conclusion: the overall return quality of this business is "medium" — demand certainty is extremely high, but how easily money is made depends on one's position in the chain. Genuine money-makers: system platforms (Vertiv/nVent/Delta, with full-stack pricing power + prepayments + service reuse) and cold plate/CDU players in the certification window (AVC/Auras — scarce rents with a mean-reversion clock). Candidates for the illusion of "revenue growth without profit": domestic centralized-procurement bidding integrators (3-8% net margin, working-capital strain, negative profit growth at the top) and non-certified pure-assembly capacity (first hit by the 2027 price war) — one must distinguish between a "business model trap" and "merely expensive valuation": the former is judged by net margin and cash flow, the latter by percentile. Sector valuation position: the SW Refrigeration & Air-Conditioning Equipment Index (where liquid-cooling names concentrate) trades at 53.3x PE, the 96th percentile since 2014-07 (median 35.8); PB 3.06x at the 64th percentile — the earnings multiple is near peak while PB is moderate, indicating the market has priced in full earnings delivery. Individual stocks: the five A-share names trade at PE(TTM) of 53-137x, all above Taiwan names (AVC 30.7/Auras 26.3) and Vertiv (~46); Envicool/Golian PE sits at the 3rd percentile of their respective 1-year windows (rapid earnings growth digesting valuation), but 5-year percentiles remain high (Envicool 75%/Shenling 78%). The combination of an up-cycle × 90+ percentile valuation demands zero missteps in earnings delivery — this is the core reason this report maintains caution on A-share liquid cooling.
China (net positive): The Special Action Plan for Green and Low-Carbon Data Center Development (Fagai Huanzi [2024] No. 970) requires a national average PUE ≤1.5 by end-2025, new large/hyperscale ≤1.25, and national hub nodes ≤1.2 — under southern China's climate these thresholds effectively rule out pure air cooling, making them the most direct national-level demand driver for liquid cooling; the Green Data Center Government Procurement Requirements Standard writes PUE/green power into fiscal procurement acceptance; the first national liquid-cooling standards GB/T 48023/48097 (cold-plate type, recommended rather than mandatory) were released 2026-07 and take effect 2027-02-01, unifying tender and acceptance criteria; local compute vouchers (e.g., Guizhou RMB 140m in 2026) accelerate intelligent-compute rack deployment. The 2023 white paper of the three major carriers targeting "liquid cooling in 50% of projects by 2025" is aspirational, and carrier capex is declining — treated as a background variable. Overseas: Germany's Energy Efficiency Act requires data centers commissioned after 2026-07 to reach PUE ≤1.2 (the world's strictest), with existing stock at ≤1.5 by 2027/≤1.3 by 2030; the EU EED mandates reporting (≥500kW) and is consulting on Minimum Performance Standards until 2026-12-14, with a legislative proposal expected 2027Q2; the US has no federal mandatory cap — demand is driven by chip power. Geopolitics and trade (the main discount factor): US tariffs on China impose a burden of ~47% per the White House (2025-10); the 24% reciprocal tariff suspension, expiring 2026-11-10, has yet to be renewed, and a snapback scenario could push the blended rate toward ~60%; cold plates are confirmed to fall within Section 301 coverage, forcing mainland manufacturers toward localization/Southeast Asia footprints; the highly concentrated Taiwan supply chain (NVIDIA-ecosystem cold plates/CDUs) constitutes single-point geopolitical risk, and also a share-gain opportunity for Chinese vendors. ESG: cold-plate liquid cooling cuts PUE from a typical 1.5 (air cooling) to ≤1.2, saving ~2.628m kWh of electricity and ~1,394 tonnes of carbon per MW of IT load annually (using the national average grid emission factor of 0.5306 kgCO2/kWh); immersion can reach PUE 1.05; China's data centers consumed 166bn kWh in 2024 (1.68% of total societal usage) — under dual-carbon assessments, energy efficiency has shifted from soft disclosure to a hard procurement metric for SOEs/carriers. Net policy direction: positive, score ~35/100 (driven by hard PUE constraints; tariffs and truce uncertainty constitute real discounts).
D1 | 2027 demand slope and sizing methodology: Bulls — NVL72 output value 2027E +214% (TrendForce), four major cloud providers' 2026 capex +77%, Vertiv organic orders 3Q26 +100%, backlog $15bn; Bears — capex financing structure has qualitatively changed (leases/JVs/project debt, per Brookings), 2026 guidance may mark peak commitments, and if 2027 growth downshifts, NVL rack counts would be cut 20-30%; moreover, the Dell'Oro interpolated figure and the bottom-up bridge differ by +29.6% for 2027 ($4.6bn vs $5.9bn), with NVL alone at 77% of the interpolated total — at least one of the two datasets is systematically distorted. Tracking indicators: cloud providers' 2027 capex guidance, Taiwan monthly revenue YoY, Vertiv backlog QoQ, NVIDIA/new cloud financing guarantees.
D2 | Timing and magnitude of cold plate margin mean reversion: Bulls — generational value uplift offsets standardization price cuts (VR whole-rack cold plate value only -1% vs GB300, UBS), and certification lists remain scarce; Bears — UBS's -50% cold plate price-cut direction, NVIDIA has certified four cold plate suppliers and pushed standardized reference pricing, Taiwan capacity has already expanded 5x within 2026 (AVC 200k → 1m units/month), and SMCI/ODM-embedded CDUs are commoditizing — loosening may arrive earlier than 2027H2. The dispute over VR200 per-rack value ($55.7k vs ~$121k) is the single adjudication item for this controversy. Tracking indicators: RVL/DSX list expansion, cold plate annual price cuts, Auras gross margin, VR200 actual BOM teardowns.
D3 | Is domestic "revenue growth without profit" a trap or a lag: Bulls (lag thesis) — Envicool's Q3 standalone net profit turned positive, gross margin recovering, orders and collections are real, and overseas certifications (NPN Tier1/Google custom CDU) open a second curve; Bears (trap thesis) — centralized procurement bidding plus 15+ homogeneous bidders compressing prices, Shenling's cash flow of -RMB 1.02bn from expansion funding, and A-share valuations at the 96th percentile leave no room for earnings stumbles. Tracking indicators: Envicool contract liabilities and overseas revenue share, net margin inflection, Shenling operating cash flow.
| Scenario | Probability | Narrative | Implications |
|---|---|---|---|
| Bear | 0.25 | Cloud providers' 2027 capex guidance downshifts/financing-chain event, NVL rack counts cut 20-30%; capacity expansion collides with decelerating demand, cold plate annual price cuts >15%, price war in non-certified assembly | 2027 market size $3.9-4.3bn; cold plate gross margin below 22%; sharp pullback in A-share liquid-cooling valuations, Taiwan earnings downgrades |
| Base | 0.55 | NVL racks +50% to 64k, VR ramps on schedule; per-rack value uplift offsets unit deflation | 2027 market size ~$4.6bn (+24%); cold plate gross margin 24-28%, CDU 40-55%; domestic net margins recover slowly at 3-8% |
| Bull | 0.20 | Bottom-up bridge delivers: ASIC racks beat + VR value revised up ($121k figure confirmed) + MCL ramps early | 2027 market size $5.3-5.9bn; certified component lead times extend again, price hikes expand profits; domestic leaders with overseas certifications get a double rerating |
| Date/Window | Event | Directional Impact | Related Debate |
|---|---|---|---|
| 2026-11 | US-China tariff truce renewal talks (24% reciprocal tariff suspension expires 2026-11-10) | If not renewed, China-facing cost burden rises from ~47% toward 60%, pressuring overseas expansion costs and Taiwanese players' mainland capacity | D3 |
| 2026-12-14 | Deadline for public consultation on EU data center minimum energy performance standards (MPS) | A hard cap would replicate the German model, amplifying European demand | D1 |
| 2027-02-01 | Implementation of China's national liquid cooling standards GB/T 48023/48097 (recommended) | Unifies bidding and acceptance criteria, reduces delivery friction | D3 |
| 2027-03 | A-share/Taiwan 2026 annual report season | Tests the domestic net margin inflection and Taiwanese cold plate gross margins | D3/D2 |
| 2027Q1-Q2 | VR200 NVL144 ramp-up and teardown BOM analysis | Settles the debate over per-rack value, directly determining 2027 revenue elasticity | D2 |
| 2027Q2 | EU MPS legislative proposal | Slope of European demand | D1 |
| 2027Q3 | AVC (Qi Xuan) Vietnam capacity comes online (cold plates +50%) | Leading signal for cold plate loosening and annual price-down negotiations | D2 |
| 2027H2 | First shipments of Kyber NVL576 ~600kW racks; cold plate annual price-down negotiations | A 600kW rack delay would invalidate front-loaded demand; price-down magnitude tests cold plate profitability | D1/D2 |
| 2027Q4 | Big four hyperscalers' 2028 capex guidance | Confirmation/refutation signal from the very top of the demand chain | D1 |
How to read the chart: Upper right (core holdings) = Vertiv/Delta/nVent/AVC—overseas certification chains and system platforms, with volume, price, and margins moving in the same direction; lower right (value trap zone) = Shenling Environment and uncertified cold plate/CDU pure assembly capacity—industry momentum is rising (horizontal axis to the right) but returns are poor (vertical axis at the bottom): collective procurement bidding + advance financing + the 2027 price war consume the momentum dividend; "bullish on the industry ≠ worth buying" holds at these two points. Envicool sits in the lower right, toward the upper part—net margin of ~7.5% is weak, but the overseas certification option (NPN Tier1 + Google custom CDUs) provides a path toward the upper right, making it an option-style "time-for-space" play rather than a typical trap; Goaland/Sugon returns are improving but still weak. The upper-left/lower-left quadrants currently have virtually no names in this industry—momentum is rising across the entire chain; the difference lies only in profit capture.
Beneficiaries (by priority): ①Vertiv—full-stack platform spanning power + cooling + services, $15.0 billion backlog, 25.2% adjusted operating margin; the most stable profit pool even amid certification openness (PE ~46x, YTD -18% offers better odds than A-shares); ②Delta Electronics—de facto standard in Sidecar CDUs + ~70% share in AI power, most resistant to squeezing amid the decoupling trend; ③AVC—certified cold plate leader, 19.6% net margin, PE 30.7x near a one-year low, fattest earnings but watch certification expansion and annual price-downs (D2); ④nVent—North American second tier, $2.5 billion order backlog; ⑤Envicool—the only domestic full-chain player + overseas certification option, the only A-share name worth watching on the left side, but 107x PE requires flawless execution on overseas revenue.
Avoid: ①Shenling Environment—growing revenue without profit (9M26 revenue +36.9%/net profit -5.4%) + operating cash flow of -1.02 billion yuan tied up in advance financing + PE 121x; a textbook lower-right quadrant case; ②Uncertified cold plate/CDU pure assembly capacity—first in the line of fire in the 2026Q4-2027 price war; capacity can be replicated in 6-9 months, no moat; ③Goaland/Tongfei-type small-cap high-valuation names—decent business quality but insufficient value at PE 53-137x; wait for order visibility to improve.
| Scenario | Biggest Beneficiaries | Biggest Losers |
|---|---|---|
| Bear (0.25) | Vertiv (full stack + prepayment buffer), nVent | Uncertified assembly capacity, Auras (price war), high-valuation A-share integrators (Shenling/Goaland) |
| Base (0.55) | Vertiv, AVC, Delta, nVent; Envicool (overseas breakthroughs gradually materializing) | Uncertified assembly capacity |
| Bull (0.20) | AVC/Auras (double hit on volume and price), Envicool (double hit on overseas expansion + valuation), Vertiv (price increases on certified components) | None (broad rally, but A-shares offer the greatest elasticity) |
① Rising reliance on external financing for hyperscaler capex; downgrade of 2027 guidance (D1, biggest risk); ② NVIDIA standardization + rapid expansion of the certification list, cold plate/CDU premiums vanishing before 2028 (D2); ③ Breakdown of the US-China tariff truce (China-facing burden approaching ~60%), hurting both mainland players' overseas expansion and Taiwanese players' mainland capacity; ④ Taiwan Strait geopolitical disruptions to Taiwan-concentrated supply chains; ⑤ High copper prices (Shanghai copper ~108,000 yuan/ton, backwardated structure) eroding cold plate gross margins; ⑥ A-share liquid cooling valuations at the 96th percentile leave zero tolerance for any earnings deceleration. All names above are discussed at the industry-segment level; for individual target prices and entry/exit points, please build separate dossiers on names of interest.
Definitions and Data Notes: The headline market figures in this report use Dell'Oro manufacturer revenue (2026-2028 geometrically interpolated and so noted); per-rack value is anchored on Morgan Stanley's teardown (cross-checked with Tom's Hardware); Soochow/Dongguan Securities broad estimates and the Mordor aggregate estimate are used only as cross-references and are never mixed elsewhere in the text. Key figures are sourced in citations: Dell'Oro, TrendForce, ESI (energy-solutions), CAICT, IDC, company financials/announcements, NDRC Document No. 970, etc. A few figures marked "to be verified" (copper's share of cold plate BOM, VR value per expert-call estimates, domestic CDU lead-time surveys) are not used to support conclusions and serve only as leads.