Publication Date: July 2, 2026
Research Scope: China's commercial narrowbody and widebody aircraft (C919 narrowbody + C929 widebody), primary manufacturer COMAC and its supply chain
Industry Archetype: Technology Hardware / Early Commercialization (Domestic Substitution × Capacity Ramp-up)
Core Conclusion: Bullish outlook (medium conviction), but supply chain returns are sharply bifurcated—engine and high-end materials segments generate real profits, while airframe manufacturing broadly suffers "revenue growth without profit growth"; investment requires strict stock selection
Research Subject: China's large aircraft industry, encompassing the C919 (150-190 seat narrowbody mainline aircraft) and C929 (280-320 seat widebody long-range aircraft) developed under COMAC's leadership, along with the associated supply chain ecosystem.
Industry Chain Map: Upstream (raw materials/components) → Midstream (airframe structures/engines/avionics systems/final assembly integration) → Downstream (airline operations/MRO maintenance). Core segments include: Engines (CFM LEAP-1C imported / CJ-1000A domestic substitution in progress), Airframe Structures (AVIC Xi'an Aircraft, Shenyang Aircraft, Chengdu Aircraft, Hongdu), Avionics Systems (AVIC Avionics/AVIC Optoelectronics + foreign JV partners), Final Assembly Integration (COMAC).
Competitive Boundary: The C919 competes against the Airbus A320neo family and Boeing 737 MAX series, targeting the Chinese and "Belt and Road" narrowbody markets; the C929 targets the Airbus A350/Boeing 787, addressing the international long-range widebody market. Currently (mid-2026), the industry remains in early commercialization: C919 cumulative deliveries stand at approximately 38 aircraft, with orders in hand exceeding 1,000 units; capacity ramp-up is the core constraint.
China is the world's second-largest single aviation market, with 2025 civil aviation passenger traffic reaching 770 million person-trips (CAAC 2025 Statistical Bulletin), and RPK (Revenue Passenger Kilometers) of approximately 1.4 trillion passenger-kilometers. COMAC's Market Forecast Annual Report (2025-2044) projects China's RPK long-term CAGR at 5.3%, broadly consistent with Boeing's CMO forecast.
Per-capita flight frequency is only 0.55 trips (2025), versus 2.6 in the US and 1.0 in Japan, indicating substantial penetration headroom. Boeing's CMO projects China's middle-class household share will rise from 24% in 2025 to 43% by 2044, providing structural support for air travel demand.
Using China's civil aviation fleet of 4,574 aircraft at end-2025 (3,525 narrowbody + 466 widebody + 293 regional + 290 freighter) as the base year, projections to 2035 are as follows:
| Driver | Increment (aircraft) | Basis | Source |
|---|---|---|---|
| Fleet net growth from passenger demand | +2,462 | 4,574×(1.044^10)=7,036, net increase of 2,462 | COMAC Market Forecast Annual Report (fleet CAGR 4.4%) |
| Aging aircraft retirement/replacement | +1,650 | Boeing CMO shows 41% of new deliveries for replacement; first 10 years ~34% of new deliveries due to young fleet age | Boeing CMO 2025-2044 |
| Widebody C929 increment | +30 | C929 expected TC in 2032, first delivery 2033, cumulative ~30 aircraft by 2035 | COMAC Paris Air Show disclosure |
| Total new deliveries (2025-2035) | ≈4,142 aircraft | Excluding regional C909 |
Of which narrowbody new deliveries ≈3,111 aircraft (including C919 substitution headroom), based on COMAC's 20-year forecast of 7,250 narrowbody aircraft needed in China with the first 10 years accounting for ~43%.
COMAC forecasts China will need 9,856 new aircraft over the next 20 years, valued at approximately $1.48 trillion (≈RMB 10.7 trillion), including 7,250 narrowbody (74%) and 1,621 widebody (16%), constituting the ultimate TAM for the C919/C929.
C919 penetration of China's new narrowbody deliveries starts from a minimal base:
| Year | C919 Annual Deliveries (aircraft) | Share of Annual Narrowbody New Deliveries | Cumulative Deliveries (aircraft) |
|---|---|---|---|
| 2025A | 15 | ~1% | 31 |
| 2026E | 25-28 | ~3% | 56-59 |
| 2027E | 45-70 | ~8-12% | 101-129 |
| 2028E | 65-90 | ~15-20% | 166-219 |
| 2030E | 80-120 | ~20-30% | 326-429 |
| 2035E | 150-190 | ~35-40% | ~1,075 |
Note: Capacity paths have been revised downward per red-team critique—COMAC's 2025 target of 75 aircraft was met with only 15 (20% achievement rate); Q1 2026 annualized at only 12 aircraft. Any capacity forecast must be anchored to this historical execution record. The baseline path in this table corresponds to annual capacity growing from 28 aircraft (2026) → 70 (2027) → 120 (2030) → 190 (2035), below COMAC's official targets of "150 aircraft by 2027 / 200 by 2029."
Inflection Point Assessment: The structural inflection point for C919 domestic substitution lies not in "whether demand exists" (demand certainty is high), but in "whether supply can be unlocked." Current orders exceed 1,000 aircraft versus annual deliveries of 15-28, implying an order-to-delivery ratio of approximately 35-65x. The true inflection point arrives when capacity breaks through 50 aircraft/year (expected 2027-2028)—at which point the C919 transitions from a "political mandate" to an industry generating meaningful scale revenue.
Sources: CAAC 2025 Civil Aviation Industry Development Statistical Bulletin, COMAC Market Forecast Annual Report (2025-2044), Boeing CMO 2025-2044, IBA COMAC Aircraft Programmes Status & Outlook
Historical Delivery Record: 3 aircraft in 2023 → 12 in 2024 → 15 in 2025 (target 75, 20% achievement rate). Q1 2026 delivered only 3 aircraft (annualized 12), with a full-year target of 28.
Final Assembly Line Layout:
| Facility | Capacity Plan | Status |
|---|---|---|
| Shanghai Pudong Zhujiao (2 existing lines) | Nominal 48-60 aircraft/year | Operational, ~31% actual utilization in 2025 |
| Shanghai Lingang Phase II (4 intelligent lines) | 150+ aircraft/year | Under construction, total investment RMB 11.95 billion, 330,000 m², expected operational 2027 |
| Chengdu Aviation Industrial Park Final Assembly Line | 48-60 aircraft/year | Under construction, expected completion 2026 |
Capacity Ramp-up Path (Red-Team Adjusted): 15 aircraft delivered in 2025 (31% utilization) → 2026 target 28 (Q1 only 3, challenging to achieve) → Lingang Phase II partially operational 2027, delivering 50-70 → 90-120 in 2029 → 120-150 in 2030.
Core Constraints: ①Engine supply is the capacity ceiling—LEAP-1C relies entirely on US export licenses (suspended for 2 months in May-July 2025); CJ-1000A substitution still requires 2-3 years; ②Avionics/flight control localization rate is only ~38% (COMAC announced overall aircraft localization rate of 59% in April 2026, but avionics and flight controls remain heavily dependent on JVs); ③COMAC has never met its capacity targets historically (2025 target 75→15), and an execution discount should be applied.
The domestic CJ-1000A engine is the linchpin of C919 supply chain self-sufficiency:
| Metric | CJ-1000A (Domestic) | LEAP-1C (Imported) |
|---|---|---|
| Thrust | 13.5 tonnes | 13.0-13.7 tonnes |
| Thrust-to-weight ratio | 4.5 | 3.3 |
| Localization rate | 91.4% | 0% |
| Certification status | Expected CAAC TC in Q2 2026 | Certified (subject to US export controls) |
| Batch installation | Optimistic 2028, baseline 2029 | Currently the only installed engine |
| Unit engine cost | Undisclosed (may exceed LEAP initially) | Mature product |
Red-Team Ruling: The multi-party argument that "CJ-1000A will achieve batch substitution in 2027" is overly optimistic. Certification has already been delayed from end-2025; from installation validation to batch production typically requires 2-3 years (airworthiness authorities require route validation + production license certification); single-crystal turbine blade lifespan still lags imports (imports >20,000 hours). This report's baseline assumption: CJ-1000A receives TC in Q2-Q3 2026, small-batch installation validation in 2027, and meaningful batch substitution in 2028-2029. Engines account for only ~28% of total aircraft cost; a 14-15% engine cost reduction contributes only ~4% to the overall aircraft.
The C929 is in the detailed design phase (wind tunnel testing initiated February 2026), with 280-320 seats, 12,000 km range, and composite material share >50%. Target TC in 2032, with first deliveries in 2033. It will be equipped with the domestic CJ-2000A engine (35-tonne thrust class; core module has completed high-pressure compressor testing). The C929's primary supply chain pull is in avionics localization leapfrogging (adopting the fully autonomous "Tianmai" avionics system).
Sources: 21st Century Business Herald, South China Morning Post, IBA COMAC Outlook, Reuters (EASA certification coverage), Ringier Industrial Resources (CJ-1000A coverage)
| Year | C919 Actual/Expected Deliveries | Domestic Narrowbody Annual Demand (Potential) | Gap |
|---|---|---|---|
| 2025A | 15 aircraft | ~60 aircraft (per target share) | -45 aircraft |
| 2026E | 25-28 aircraft | ~80 aircraft | -52~-55 aircraft |
| 2027E | 50-70 aircraft | ~100 aircraft | -30~-50 aircraft |
| 2030E | 120-150 aircraft | ~400 aircraft | -250~-280 aircraft (30% market share scenario) |
Nature of the gap: It is not insufficient demand, but supply fundamentally unable to keep pace. With 1,005 confirmed + 120 intended orders in hand, at 28 aircraft/year in 2026, the backlog covers approximately 36 years.
The C919 adopts the aviation industry standard "list price-discount" model:
Key Finding: The C919's list price is ~11% lower than the A320neo, but because A320neo/737MAX discounts are deeper (40-60% vs C919's 15-30%), the C919's actual transaction price may be equal to or slightly higher than competitors—indicating the C919 does not compete on price but is driven by policy orders and domestic substitution logic. This is both an advantage (no price war needed) and a risk (if policy support weakens, airlines may shift to cheaper mature aircraft types).
| Period | Estimated Effective ASP | Rationale |
|---|---|---|
| Q3 2026 | $72-80 million | Low capacity utilization (~58%), extended-range variant share increase lifts weighted ASP |
| Q4 2026 | $73-82 million | Year-end delivery push; if 28-aircraft full-year target is met, discount rates may narrow slightly |
| H1 2027 | $74-83 million | Lingang Phase II gradual commissioning expectations; COMAC bargaining power marginally improves |
| H2 2027 | $75-85 million | Scale effects from 60-70 aircraft/year capacity target begin to emerge; if CJ-1000A installation validation succeeds, supply chain risk declines |
Pricing Framework: List price ($99-108M) × (1 - discount rate 15-25%). The discount rate trend is the core variable—narrowing from the high discounts (~25-30%) of the 2025 initial customer development phase to 15-20% by 2027, but the pace of narrowing depends on capacity delivery and accumulated operational data.
| Item | Value |
|---|---|
| Unit manufacturing marginal cost | ~RMB 450 million |
| Unit revenue (at actual ASP) | ~RMB 500-600 million (depending on discount) |
| Unit gross profit (ex-manufacturing cost) | RMB 50-150 million |
| Total R&D investment (C919 program) | ~RMB 50 billion |
| Break-even production volume (incl. R&D amortization) | ~500 aircraft |
| Expected break-even timing | 2029-2031 |
Aerospace manufacturing learning curves are typically 80-85% (cost declines 15-20% per doubling of production). From 15 aircraft in 2025 to 85 in 2028 (2.5x production increase), unit manufacturing costs are expected to decline 25-35%.
Sources: China Eastern announcement (2023-09-28), Air China announcement (2024-04-26), IBA COMAC Outlook, Oriental Fortune Securities research report
The global narrowbody market is monopolized by the Airbus-Boeing duopoly (~98% combined), and the C919 is entering an extremely high-barrier mature market. However, the biggest variable is that China accounts for ~20% of global narrowbody demand, and Chinese airlines are being policy-guided toward domestic alternatives—making it possible for the C919 to achieve breakthrough in the domestic market first.
Profit Pool Tiers:
| Tier | Segment | Representative Companies | Margin Profile | Investment Implication |
|---|---|---|---|---|
| Tier 1: Real profit generators | Engines, high-end materials, connectors | AVIC High-Tech, AVIC Optoelectronics | Gross margin >29%, high technical barriers, products reusable across military/civil/other tracks | Core allocation |
| Tier 2: Option value segments | Domestic engine final assembly, avionics localization | AECC Aviation Power, AVIC Avionics | Currently thin margins but significant long-term option value (CJ-1000A, avionics substitution) | Thematic allocation |
| Tier 3: Revenue growth without profit growth | Airframe structure manufacturing | AVIC Xi'an Aircraft, Hongdu Aviation | Gross margin <7%, net margin <3%, large revenue thin profit, dependent on scale effects | Avoid/cautious |
| Tier 4: Currently loss-making but largest future profit pool | Primary manufacturer | COMAC (unlisted) | Annual revenue <RMB 20 billion, R&D amortization ongoing, break-even requires 500 aircraft | Not directly investable |
| Player | Ticker | Industry Chain Position | Key Metrics | One-Line Assessment |
|---|---|---|---|---|
| COMAC | Unlisted | Primary manufacturer/final assembly integration | Registered capital RMB 94.1 billion (post-2025 capital increase), orders >1,000 aircraft | Absolute core of the industry chain; break-even expected 2029-2031 |
| AVIC High-Tech | 600862 | Aviation carbon fiber composites | Revenue RMB 5 billion, gross margin ~35%, net margin >20% | Exclusive C919 composites supplier; best profit quality in the chain |
| AVIC Optoelectronics | 002179 | Aviation connectors | Revenue RMB 21.3 billion, gross margin 29%, net profit RMB 2.1 billion | Gross margin near 30%, benefits across multiple tracks; scarce "meat-eating" target in the chain |
| AVIC Avionics | 600372 | Avionics system integration | Revenue ~RMB 26 billion, gross margin ~30%, operating cash flow turned positive | Core vehicle for avionics localization from 30%→60%+ |
| AECC Aviation Power | 600893 | Domestic engine final assembly | Revenue ~RMB 43 billion, gross margin 9%, net margin 1.4% | CJ-1000A option target; weak profitability but extremely high strategic value |
| AVIC Xi'an Aircraft | 000768 | Airframe structure (largest supplier) | Revenue RMB 41 billion, gross margin 6.4%, operating cash flow -RMB 8.35 billion | Most direct beneficiary of C919 volume ramp-up, but pronounced "large revenue, thin profit" profile |
| Hongdu Aviation | 600316 | Airframe structure (forward fuselage/mid-aft fuselage) | Revenue RMB 7.4 billion (+42%), gross margin 2.95%, net margin 0.53% | Typical cautionary case of revenue growth without profit growth |
| Triangle Defense | 300775 | Aviation forgings | Revenue RMB 1.6 billion, gross margin ~31%, highly volatile earnings | High-barrier niche leader but extremely cyclical |
Return Quality Conclusion: The overall return quality of China's large aircraft supply chain is currently Poor. Only the engine, high-end materials, and connector segments generate real profits (high and sustainable ROIC). Airframe structure manufacturing is a classic "revenue growth without profit growth" value trap, while COMAC itself is in a "burning cash for capacity" phase. Supply chain profits are concentrating in high-barrier segments with high localization rates — a trend expected to persist over the next 5-10 years.
Sources: Company 2025 annual reports, FlightGlobal, IBA COMAC Outlook, ABC Securities/ Everbright Securities/ Dongguan Securities research reports
| Policy | Content | Impact |
|---|---|---|
| 15th Five-Year Plan Outline | Aviation industry upgraded from "emerging industry" to "emerging pillar industry" | Highest policy priority, directing capital, land, and talent allocation |
| State capital injection (Nov 2025) | 8 state-owned shareholders collectively injected ~RMB 44 billion into COMAC; registered capital increased from RMB 50.1 billion to 94.1 billion (+88%) | Largest capital injection since inception, supporting capacity ramp-up and C929 R&D |
| Three major airlines procurement | China Eastern 105 aircraft, Air China 150, China Southern 100 (cumulative confirmed orders exceeding 350 aircraft) | Quasi-mandated domestic substitution, providing an anchor of assured demand |
| CJ-1000A National Special Project | Special funding + policy priority, targeting TC by Q2 2026 | Core lever to resolve the engine bottleneck |
| Shanghai Large Aircraft Industrial Park | "One core, two corridors, three bases", targeting industrial scale of RMB 80 billion by 2026 | Accelerates supply chain localization |
Net Direction: Extremely positive domestic policy — national strategic positioning + RMB 44 billion capital injection + locked-in orders for over 1,000 aircraft constitute assured support for capacity ramp-up.
| Certification Authority | Status | Expected Timeline |
|---|---|---|
| CAAC (China) | ✅ TC obtained (Sept 2022) | Completed |
| EASA (Europe) | Phase 3 flight test verification ongoing (EASA pilots stationed in Shanghai since April 2026) | 2028-2031 (Reuters, April 2025 report) |
| FAA (US) | No formal application; US-China airworthiness negotiations scheduled for Q4 2026 | No clear timeline; likely 2030+ |
"Rural areas surrounding the cities" strategy: Brunei recognized CAAC certification in October 2025, and China is promoting bilateral airworthiness mutual recognition with multiple ASEAN countries (Vietnam, Laos, Indonesia, Cambodia, etc.) to open export channels for the C919 in emerging markets.
The C919 is powered by the LEAP-1C (same family as A320neo/737MAX), with carbon emissions approximately 15% lower than the previous-generation CFM56, on par with competitors. The first commercial flight using SAF (Sustainable Aviation Fuel) was completed in 2024 with no compatibility issues. The CJ-1000A's NOx emissions are 20% lower than CAEP6 standards, and noise meets Stage 4 requirements. ESG/carbon does not constitute a barrier to differentiated competition.
Net Direction: Slightly bullish. Extremely positive domestic policy > geopolitical headwinds. Key tracking indicators: ①EASA certification progress at each stage; ②LEAP-1C export license status; ③CJ-1000A certification timing.
Sources: 15th Five-Year Plan Outline (NDRC), 21st Century Business Herald (COMAC capital increase), Reuters (EASA coverage), Observer (LEAP-1C suspension coverage), US DoD Federal Register
| Bull Case | Bear Case | |
|---|---|---|
| Core Argument | Phase 2 Lingang + Chengdu dual-base layout, RMB 44 billion injection secured; driven by national will, capacity will grow from 28 → 150 → 200 aircraft/year | COMAC has never met a capacity target in its history (2025: 75 → 15, 20% achievement rate); no precedent in global civil aviation history for a new program to grow output 13x within 4 years; SpaceJet: $10B+ over 15 years = 0 deliveries |
| Tracking Indicators | ①Full-year 2025 C919 deliveries (<28 aircraft = warning); ②Lingang Phase 2 commissioning timing (whether 2027); ③Monthly delivery cadence (Q1 only 3 aircraft, annualized 12, already near bear-case threshold) |
Red Team Ruling: accepted. Capacity forecasts have been significantly revised down from COMAC's official targets: 2027 from 150 → 50-70 aircraft, 2029 from 200 → 90-120 aircraft. However, even the adjusted conservative path requires regular delivery data for validation.
| Bull Case | Bear Case | |
|---|---|---|
| Core Argument | Localization rate of 91.4%, all 317 airworthiness tests completed; rapid installation after TC in Q2 2026 | Already delayed once (originally end-2025); 2-3 years needed from verification to mass production, not 1 year; single-crystal blade lifespan lags behind; the 14-15% cost reduction applies to the engine only, not the whole aircraft |
| Tracking Indicators | ①CAAC TC issuance date; ②Q3 installation verification results; ③Actual installation numbers in 2027; ④Single-crystal blade durability test data |
Red Team Ruling: accepted. The baseline scenario pushes meaningful mass replacement of the CJ-1000A from 2027 to 2028-2029.
| Bull Case | Bear Case | |
|---|---|---|
| Core Argument | China's narrowbody demand over the next 20 years is 7,250 aircraft; at a 65% domestic substitution rate → 4,713 aircraft, sufficient to support a profitable manufacturer | Airlines chose 148 Airbus aircraft over the C919 in late 2025, revealing true preferences; EASA certification requires until 2028-2031; without international certification, the C919's residual value and liquidity are far below international models — essentially a "closed island" |
| Tracking Indicators | ①Follow-on orders from the three major airlines (incremental or replacement); ②C919 operational reliability data in 2026 (dispatch rate/utilization); ③EASA certification progress at each stage |
Red Team Ruling: partially accepted. The "third global pole" narrative is overly ambitious; revised to "third pole in the domestic narrowbody market; third global pole no earlier than 2035+." The C919 has genuine share potential in the Chinese market, but domestic airlines' commercial preferences remain a variable.
| Scenario | Probability | Capacity Path | C919 Deliveries by 2030 | CJ-1000A | Investment Implications |
|---|---|---|---|---|---|
| 🐻 Bear | 25% | LEAP-1C supply cut again + CJ-1000A delayed to 2029; capacity stalls at 30-50 aircraft/year | 40-50 aircraft | Post-2029 | Supply chain earnings continue to decline; airframe structure segment especially vulnerable |
| 🐮 Base | 55% | Lingang/Chengdu lines commissioned on schedule; CJ-1000A mass production in 2028; capacity grows from 28 → 120 aircraft | 100-120 aircraft | Mass production in 2028 | High-end materials/connectors/avionics localization segments benefit; airframe structure remains thin-margin |
| 🚀 Bull | 20% | Capacity exceeds expectations (150+ by 2029); EASA breakthrough in 2028; CJ-1000A scaled in 2027 | 150+ aircraft | Scaled in 2027 | Entire supply chain benefits; COMAC profitability inflection point advances to 2028 |
| Time Window | Event | Directional Impact | Corresponding Debate |
|---|---|---|---|
| July 2026 | C919 H1 delivery data (as of end-June) | <14 aircraft = bearish; ≥15 = bullish | D1 |
| Q2-Q3 2026 | CJ-1000A receives CAAC type certificate | Certification = bullish; further delay = bearish | D2 |
| Q3 2026 | First CJ-1000A installation verification flight | Successful verification = major bullish | D2 |
| Q4 2026 | US-China bilateral airworthiness negotiations | Any progress signal = bullish | D3 |
| Nov 2026 | Zhuhai Airshow (C919/C929 order updates) | New orders = demand-side bullish | D1/D3 |
| Jan 2027 | C919 full-year 2026 delivery volume | <28 aircraft = warning; 30+ = bullish | D1 |
| Q1 2027 | Three major airlines' annual reports disclose C919 introduction plan adjustments | Upward revision = bullish; downward = bearish | D3 |
| H1 2027 | EASA Phase 3 flight test verification results | Positive conclusion = bullish | D3 |
| H2 2027 | Lingang Phase 2 first final assembly line commissioning | On-time commissioning = key catalyst | D1 |
Matrix Interpretation:
Core Investment Lesson: In the large aircraft supply chain, "bullish on prosperity" absolutely does not equal "worth buying" — airframe structure manufacturing is a textbook value trap: national will drives → revenue growth → but gross margins suppressed to single digits by the sole customer (COMAC) → negative operating cash flow → revenue growth without profit growth.
✅ Beneficiary Targets (ranked by logic strength):
| Target | Ticker | Logic | One-Liner |
|---|---|---|---|
| AVIC High-Tech | 600862 | Sole supplier of carbon fiber composites for C919, gross margin >35%, net margin >20%, benefiting from the structural trend of rising composite material usage | Highest earnings quality target in the supply chain; purest "profit increment" exposure to C919 volume growth |
| AVIC Optronics | 002179 | Leading aviation connector manufacturer, gross margin 29%, also benefiting from NEV/data centers, not dependent on a single customer | One of the few targets genuinely making money in the C919 supply chain with sustainable profitability |
| AVIC Airborne Systems | 600372 | Core platform for avionics/flight control localization; primary vehicle for airborne system localization rate from 30% → 60%+ | Largest value-per-aircraft upside in the supply chain; long-term non-linear growth option |
| AECC Aviation Power | 600893 | Sole final assembly unit for CJ-1000A; PE (TTM) 160x implies embedded long-term option value | High-volatility thematic target; catalyst-driven (TC certification + installation verification) |
❌ Avoid Targets:
| Target | Ticker | Logic |
|---|---|---|
| Hongdu Aviation | 600316 | Revenue +42% but gross margin 2.95%, net margin 0.53% — a typical case of revenue growth without profit growth. C919 volume growth contributes minimally to its profits |
| AVIC XAC | 000768 | Gross margin 6.4%, operating cash flow -RMB 8.35 billion and negative for three consecutive years, 2026 revenue guidance continues to decline. C919 accounts for a very small share of its revenue (profits mainly from military products); the "largest C919 airframe supplier" narrative is disproven by financial data |
Disclaimer: This report is prepared based on public information and industry research frameworks and does not constitute investment advice. Key variables such as actual C919/C929 deliveries, CJ-1000A certification timing, and EASA/FAA certification progress are subject to significant uncertainty. Investors should make independent judgments and bear corresponding risks.